The saving is structural. Check the arithmetic yourself.
Adjust the model to your organisation. The numbers illustrate the production model, not a quote — but the structure behind them is what we actually operate.
Illustrative only. Relative indices (100 / 86 / 38) reflect the production model — core engineers plus academy and verified network — and exclude travel, licensing and local taxes. Not an offer.
Three structural reasons — none of them is a shortcut
First, the domain core is small and permanent: ontology, mathematics, acceptance. Second, production is distributed across an academy with mentors. Third, the network is paid per accepted artifact.
None of these lowers the acceptance criteria. All three lower the cost per accepted artifact.
- No bench: the network is engaged per fragment.
- No rework loop: the gate catches defects before acceptance.
- No knowledge hostage: documentation is part of the artifact.
What changes when the model changes
| Dimension | In-house team | EU integrator | Energomodernization |
|---|---|---|---|
| Cost per accepted artifact | High, fixed | High, fixed + margin | Low, variable |
| Time to start | 3–6 months hiring | 1–2 months | 2–4 weeks |
| Knowledge ownership | Client | Vendor | Client, transferred |
| Scalability | Hiring-bound | Contract-bound | Network-bound |
| Risk control | Internal | Contractual | Gate + contract |
The questions a CFO will ask
Is a low index a sign of low quality?
What happens if the pilot fails?
How do you handle currency and contract risk?
Why not simply hire cheaper engineers directly?
We will rebuild this model with your numbers
Send your spend structure and the decision you need to make. We will return the model in a spreadsheet you can audit.